Callatis Gas Terminal is equipped with a modern loading ramp, specially designed for the simultaneous loading of two tankers. This facility ensures a continuous and efficient flow of loading operations, essential for road transportation of LPG.
The loading ramp boasts impressive dimensions, measuring 36.00 meters in length and 11.50 meters in width, allowing for swift maneuvering and loading of tankers. It is equipped with two loading systems with articulated arms, which provide flexibility and safety in operation. Each loading arm is designed to ensure a tight and secure coupling, preventing leaks and ensuring a rapid and efficient transfer of LPG into the tankers.
Thanks to advanced equipment and efficient organization, the two trucks can be fully loaded in approximately one hour. This high loading capacity is essential to meet the high demands of the market and to ensure the prompt delivery of LPG to the final destinations.
The terminal complies with all current safety standards and regulations, ensuring that the loading and transportation of LPG are carried out under optimal conditions. Loading equipment undergoes regular checks to maintain safety and efficiency standards at the highest levels.
We are pleased to inform you that within our company, Crystal Gas, we also have a specialized truck transport division, ready to ensure the prompt and safe delivery of LPG to your desired destination. With modern equipment and experienced staff, we guarantee that your needs will be met with professionalism and efficiency. For more information or to schedule transportation, please contact Crystal Gas SRL at phone number:
Road transport of LPG with trucks provides flexibility and accessibility, allowing direct delivery to various customers and locations. By using tanker trucks, Callatis Gas can ensure rapid and efficient distribution of LPG, covering the diverse needs of the market.
In conclusion, the advanced infrastructure of Callatis Gas Terminal, combined with modern loading equipment and commitment to safety and efficiency, makes road transport of LPG with trucks an optimal solution for distributing this essential fuel.
Railway Transport of LPG at Callatis Gas Terminal
Loading Ramp for Railway Wagons at Callatis Gas Terminal
Callatis Gas Terminal is equipped with a specialized ramp for loading railway wagons, designed for efficiency and safety in railway transport of LPG.
The ramp is located along two railway lines and is long enough to allow the loading of two groups of four CF tanks on each line. Each wagon is equipped with four electronic scales for precise measurement of the load.
The loading of LPG is carried out alternatively in the eight CF tanks, using eight systems of articulated arms, each associated with an electronic scale. The ramp is equipped with an automatic gas concentration detection system and an automatic water cooling system in case of fire, ensuring the safety of operations. Additionally, emergency buttons are available at each discharge point to quickly manage any emergency situation.
The terminal offers the possibility to directly unload 1,3-butadiene from CF tanks into vessels without requiring intermediate storage on-site. This option optimizes the transportation process and reduces handling times, ensuring efficient and swift distribution of LPG to final destinations.
Through specialized infrastructure and equipment, the loading ramp for CF wagons at Callatis Gas Terminal is founded on principles of safety, efficiency, and compliance, contributing to the facilitation of railway transportation of LPG across the region.
Village 2 Mai, Limanu Commune, PORT MANGALIA, Constanța County